2024/53/B/ST7/04220
Keywords:
nonlinear control systems geometric methods mechanical systems flatness feedback linearization observers nonholonomic constraints symmetries
Descriptors:
Panel:
ST7 - Systems and communication engineering: electronics, communication, optoelectronics
Principal investigator (from the host institution):
Number of co-investigators in the project: 6
Call: OPUS 27 - announced on 2024-03-21
Amount awarded: 1 232 200 PLN
Project start date (Y-m-d): 2025-02-13
Project end date (Y-m-d): 2029-02-12
Project duration:: 48 months (the same as in the proposal)
Project status: Pending project
Download the project description in a pdf file
Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.