2023/51/D/ST8/01795
Keywords:
FRP composites self-compacting concrete perforated composite tubes load-bearing capacity concrete columns
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Politechnika Krakowska im. Tadeusza Kościuszki
woj. małopolskie
Principal investigator (from the host institution):
Number of co-investigators in the project: 2
Call: SONATA 19 - announced on 2023-09-18
Amount awarded: 709 000 PLN
Project start date (Y-m-d): 2024-10-01
Project end date (Y-m-d): 2027-09-30
Project duration:: 36 months (the same as in the proposal)
Project status: Pending project
Download the project description in a pdf file
Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.