Projects funded by the NCN


Information on the principal investigator and host institution

Information of the project and the call

Keywords

Equipment

Delete all

CO2 utilization and sequestration: Investigation of multiple-time-recycled construction waste powder modified by carbonation as a partial replacement for cement.

2023/51/B/ST8/00621

Keywords:

Sustainable development CO2 utilization carbon sequestration construction waste cementitious mixture

Descriptors:

  • ST8_2: Maritime/hydraulic/water engineering, civil engineering, aerospace engineering
  • ST8_14: Other related subjects

Panel:

ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems

Host institution :

Politechnika Wrocławska

woj. dolnośląskie

Other projects carried out by the institution 

Principal investigator (from the host institution):

Jeonghyun Kim 

Number of co-investigators in the project: 1

Call: OPUS 26 - announced on 2023-09-18

Amount awarded: 323 042 PLN

Project start date (Y-m-d): 2024-08-01

Project end date (Y-m-d): 2027-07-31

Project duration:: 36 months (the same as in the proposal)

Project status: Pending project

Project description

Download the project description in a pdf file

Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.