Projects funded by the NCN


Information on the principal investigator and host institution

Information of the project and the call

Keywords

Equipment

Delete all

Processes for metal-to-char encapsulation

2020/39/I/ST8/01484

Keywords:

biomass thermal conversion CO2 emission

Descriptors:

  • ST8_5: Power systems (production, distribution)

Panel:

ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems

Host institution :

Politechnika Śląska, Wydział Inżynierii Środowiska i Energetyki

woj. śląskie

Other projects carried out by the institution 

Principal investigator (from the host institution):

prof. Andrzej Szlęk 

Number of co-investigators in the project: 7

Call: OPUS 20 (LAP) - announced on 2020-09-15

Amount awarded: 1 756 800 PLN

Project start date (Y-m-d): 2021-11-02

Project end date (Y-m-d): 2025-11-01

Project duration:: 48 months (the same as in the proposal)

Project status: Pending project

Project description

Download the project description in a pdf file

Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.