2017/26/E/ST8/00532
Keywords:
structural dynamics vibrations smart materials
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Instytut Podstawowych Problemów Techniki Polskiej Akademii Nauk
woj. mazowieckie
Principal investigator (from the host institution):
Number of co-investigators in the project: 4
Call: SONATA BIS 7 - announced on 2017-06-14
Amount awarded: 1 072 700 PLN
Project start date (Y-m-d): 2018-04-12
Project end date (Y-m-d): 2025-04-11
Project duration:: 60 months (the same as in the proposal)
Project status: Pending project
Download the project description in a pdf file
Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.