2016/21/N/ST8/02390
Keywords:
coastal engineering coastal dynamics wave run-up
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Instytut Budownictwa Wodnego Polskiej Akademii Nauk
woj. pomorskie
Principal investigator (from the host institution):
Number of co-investigators in the project: 3
Call: PRELUDIUM 11 - announced on 2016-03-15
Amount awarded: 89 920 PLN
Project start date (Y-m-d): 2017-02-22
Project end date (Y-m-d): 2019-02-21
Project duration:: 24 months (the same as in the proposal)
Project status: Project settled
Download the project description in a pdf file
Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.