Projects funded by the NCN


Information on the principal investigator and host institution

Information of the project and the call

Keywords

Equipment

Delete all

Innovative Extremely Modular Systems for temporary and permanent deployable structures and habitats: development, modeling, evaluation & optimization

2016/21/P/ST8/03856

Keywords:

discrete-continuous optimization skeletal structure Extremely Modular System Truss-Z Pipe-Z pedestrian ramp heuristic methods modular habitat

Descriptors:

  • ST8_10: Technical aspects of architecture, urban studies and spatial planning
  • ST8_3: Computational engineering, computer-aided modelling, design and manufacturing
  • ST8_2: Maritime/hydraulic/water engineering, civil engineering, aerospace engineering

Panel:

ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems

Host institution :

Instytut Podstawowych Problemów Techniki Polskiej Akademii Nauk

woj. mazowieckie

Other projects carried out by the institution 

Principal investigator (from the host institution):

dr Maciej Zawidzki 

Number of co-investigators in the project: 2

Call: POLONEZ 2 - announced on 2016-03-15

Amount awarded: 856 074 PLN

Project start date (Y-m-d): 2017-02-01

Project end date (Y-m-d): 2019-01-31

Project duration:: 24 months (the same as in the proposal)

Project status: Project settled

Project description

Download the project description in a pdf file

Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.

Niniejszy projekt otrzymał dofinansowanie w ramach programu finansowania badań naukowych i innowacji UE „Horyzont 2020” na podstawie umowy Nr 665778 o dofinansowanie działań „Marie Skłodowska-Curie”.