2015/19/B/ST8/02000
Keywords:
intermetallics detonacja gazowa powłoki ochronne
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Uniwersytet Warmińsko-Mazurski w Olsztynie, Wydział Nauk Technicznych, Katedra Technologii Materiałów i Maszyn
woj. warmińsko-mazurskie
Principal investigator (from the host institution):
Number of co-investigators in the project: 7
Call: OPUS 10 - announced on 2015-09-15
Amount awarded: 565 280 PLN
Project start date (Y-m-d): 2016-08-10
Project end date (Y-m-d): 2020-02-09
Project duration:: 42 months (the same as in the proposal)
Project status: Project settled
Download the project description in a pdf file
Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.