2013/11/B/ST8/00352
Keywords:
optimization strategy multi-criteria optimization optimization of production chains
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie, Wydział Inżynierii Metali i Informatyki Przemysłowej
woj. małopolskie
Principal investigator (from the host institution):
Number of co-investigators in the project: 6
Call: OPUS 6 - announced on 2013-09-16
Amount awarded: 296 563 PLN
Project start date (Y-m-d): 2014-09-01
Project end date (Y-m-d): 2017-02-28
Project duration:: 30 months (the same as in the proposal)
Project status: Project settled