2013/09/N/ST8/01064
Keywords:
mineralization chitosan hydrogel
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Politechnika Łódzka, Wydział Inżynierii Procesowej i Ochrony Środowiska
woj. łódzkie
Principal investigator (from the host institution):
Number of co-investigators in the project: 3
Call: PRELUDIUM 5 - announced on 2013-03-15
Amount awarded: 99 740 PLN
Project start date (Y-m-d): 2014-03-21
Project end date (Y-m-d): 2016-03-20
Project duration:: 24 months (the same as in the proposal)
Project status: Project settled