2013/09/B/ST8/02418
Keywords:
plasma surface engineering electric discharge in gas under reduced pressure cathode sputtering
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Politechnika Warszawska, Wydział Inżynierii Materiałowej
woj. mazowieckie
Principal investigator (from the host institution):
Number of co-investigators in the project: 5
Call: OPUS 5 - announced on 2013-03-15
Amount awarded: 759 630 PLN
Project start date (Y-m-d): 2014-03-04
Project end date (Y-m-d): 2017-03-03
Project duration:: 36 months (the same as in the proposal)
Project status: Project settled