2012/07/B/ST8/04019
Keywords:
acive fibre glasses doped with lanthanides antimony glass rare earth elemnts
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Politechnika Białostocka, Wydział Elektryczny
woj. podlaskie
Principal investigator (from the host institution):
Number of co-investigators in the project: 14
Call: OPUS 4 - announced on 2012-09-15
Amount awarded: 529 500 PLN
Project start date (Y-m-d): 2013-06-25
Project end date (Y-m-d): 2016-06-24
Project duration:: 36 months (the same as in the proposal)
Project status: Project settled