2012/05/N/ST5/01499
Keywords:
peptide synthesis copper(II) complexes potentiometric study spectroscopy UV-VIS circular dichroism
Descriptors:
Panel:
ST5 - Materials: materials synthesis, structure-properties relations, advanced and functional materials with designed properties, (macro)molecular architecture, material engineering
Host institution :
Instytut Biochemii i Biofizyki PAN
woj. mazowieckie
Principal investigator (from the host institution):
Number of co-investigators in the project: 2
Call: PRELUDIUM 3 - announced on 2012-03-15
Amount awarded: 88 601 PLN
Project start date (Y-m-d): 2013-02-15
Project end date (Y-m-d): 2015-02-14
Project duration:: 24 months (the same as in the proposal)
Project status: Project settled