2012/05/B/ST8/01837
Keywords:
superconductivity fault current limiter 2G HTS tape
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Instytut Elektrotechniki
woj. mazowieckie
Principal investigator (from the host institution):
Number of co-investigators in the project: 8
Call: OPUS 3 - announced on 2012-03-15
Amount awarded: 415 456 PLN
Project start date (Y-m-d): 2013-02-14
Project end date (Y-m-d): 2015-11-13
Project duration:: 33 months (the same as in the proposal)
Project status: Project settled