2011/03/B/ST8/06447
Keywords:
experimental investigation thin-walled beam-columns composite nonlinear stability
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Principal investigator (from the host institution):
Number of co-investigators in the project: 7
Call: OPUS 2 - announced on 2011-09-15
Amount awarded: 1 049 500 PLN
Project start date (Y-m-d): 2012-08-07
Project end date (Y-m-d): 2015-08-06
Project duration:: 36 months (the same as in the proposal)
Project status: Project settled