2011/03/D/ST8/04467
Keywords:
biogasification bioconversion biogas methane,brown coal underground
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
KGHM Cuprum sp. z o.o. Centrum Badawczo-Rozwojowe
woj. dolnośląskie
Principal investigator (from the host institution):
Number of co-investigators in the project: 3
Call: SONATA 2 - announced on 2011-09-15
Amount awarded: 457 000 PLN
Project start date (Y-m-d): 2012-12-17
Project end date (Y-m-d): 2016-03-16
Project duration:: 39 months (the same as in the proposal)
Project status: Project settled