2011/01/B/ST8/06579
Keywords:
slabs dynamics fibre reinforced concrete impact resistance
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
POLITECHNIKA KOSZALIŃSKA
woj. zachodniopomorskie
Principal investigator (from the host institution):
Number of co-investigators in the project: 5
Call: OPUS 1 - announced on 2011-03-15
Amount awarded: 140 000 PLN
Project start date (Y-m-d): 2011-12-14
Project end date (Y-m-d): 2013-12-13
Project duration:: 24 months (the same as in the proposal)
Project status: Project settled