2016/21/P/ST8/03856
Keywords:
discrete-continuous optimization skeletal structure Extremely Modular System Truss-Z Pipe-Z pedestrian ramp heuristic methods modular habitat
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution :
Instytut Podstawowych Problemów Techniki Polska Akademia Nauk
woj. mazowieckie
Principal investigator (from the host institution):
Number of co-investigators in the project: 2
Call: POLONEZ 2 - announced on 2016-03-15
Amount awarded: 856 074 PLN
Project start date (Y-m-d): 2017-02-01
Project end date (Y-m-d): 2019-01-31
Project duration:: 24 months (the same as in the proposal)
Project status: Project completed
Download the project description in a pdf file
Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.
Publications will be made available after the final report has been accepted.