Models and algorithms for some discrete-continuous project scheduling problems

2013/11/B/ST6/00970

Keywords:

project scheduling discrete resources continuous resources scheduling nonlinear programming scheduling algorithms heuristics metaheuristics computational experiments

Descriptors:

  • ST6_12: Scientific computing, simulation and modelling tools
  • ST6_6: Algorithms, parallel, distributed and network algorithms, algorithmic game theory
  • ST6_14: Other related subjects

Panel:

ST6 - Computer science and informatics: informatics and information systems, computer science, scientific computing, intelligent systems

Host institution :

Politechnika Poznańska, Wydział Informatyki

woj. wielkopolskie

Other projects carried out by the institution 

Principal investigator (from the host institution):

dr hab. Grzegorz Waligóra 

Number of co-investigators in the project: 1

Call: OPUS 6 - announced on 2013-09-16

Amount awarded: 150 800 PLN

Project start date (Y-m-d): 2014-07-22

Project end date (Y-m-d): 2017-07-21

Project duration:: 36 months (the same as in the proposal)

Project status: Project settled

Information in the final report

  • Publication in academic press/journals (3)
  • Articles in post-conference publications (4)
  • Book publications / chapters in book publications (1)
  1. An approach to reduce energy consumption and performance losses on heterogeneous servers using power capping
    Authors:
    Ciesielczyk T., Cabrera A., Oleksiak A., Piątek W., Waligóra G., Almeida F., Blanco V.
    Academic press:
    Journal of Scheduling (rok: 2020, ), Wydawca: Springer
    Status:
    Accepted for publication
  2. Comparative analysis of some metaheuristics for discrete-continuous project scheduling with activities of identical processing rates
    Authors:
    Waligóra G.
    Academic press:
    Asia-Pacific Journal of Operational Research (rok: 2016, tom: 33 (3), strony: 1650015-1 - 1650015-32), Wydawca: World Scientific
    Status:
    Published
    DOI:
    10.1142/S0217595916500159 - link to the publication
  3. Discrete-continuous project scheduling with preemptable activities
    Authors:
    Różycki R., Waligóra G., Węglarz J.
    Academic press:
    Bulletin of the Polish Academy of Sciences: Technical Sciences (rok: 2016, tom: 64 (2), strony: 383-393), Wydawca: Polish Academy of Sciences
    Status:
    Published
    DOI:
    10.1515/bpasts-2016-0043 - link to the publication
  1. Heuristic solving some discrete-continuous project scheduling problems with discounted cash flows
    Authors:
    Waligóra G., Różycki R.
    Conference:
    21st IEEE International Conference on Methods and Models in Automation and Robotics MMAR 2016 (rok: 2016, ), Wydawca: IEEE
    Data:
    konferencja 29.08-01.09
    Status:
    Published
  2. Algorithm for a preemptive project scheduling problem under a continuous resource varying over time
    Authors:
    Waligóra G., Węglarz J.
    Conference:
    15th International Conference on Project Management and Scheduling PMS 2016 (rok: 2016, ), Wydawca: University of Valencia
    Data:
    konferencja 19-22.04
    Status:
    Published
  3. Genetic algorithm for a discrete-continuous project scheduling problem with discounted cash flows
    Authors:
    Waligóra G.
    Conference:
    20th IEEE International Conference on Methods and Models in Automation and Robotics MMAR 2015 (rok: 2015, ), Wydawca: IEEE
    Data:
    konferencja 24-27.08
    Status:
    Published
  4. Metaheuristics for some discrete-continuous project scheduling problems to maximize the net present value
    Authors:
    Waligóra G.
    Conference:
    22nd IEEE International Conference on Methods and Models in Automation and Robotics MMAR 2017 (rok: 2017, ), Wydawca: IEEE
    Data:
    konferencja 28-31.08
    Status:
    Published
  1. Continuous resources
    Authors:
    Waligóra G., Węglarz J.
    Book:
    Handbook on Project Management and Scheduling (rok: 2015, tom: 1, strony: 191-202), Wydawca: Springer
    Status:
    Published