Models and algorithms for some discrete-continuous project scheduling problems

2013/11/B/ST6/00970

Keywords

Descriptors

  • ST6_12: Obliczenia naukowe, narzędzia modelowania i symulacji
  • ST6_6: Algorytmika, algorytmy równoległe, rozproszone i sieciowe, algorytmiczna teoria gier
  • ST6_14: Inne zagadnienia pokrewne

Panel

ST6 – Computer science and informatics: informatics and information systems, computer science, scientific computing, intelligent systems

Host institution

Politechnika Poznańska, Wydział Informatyki

Voivodeship: wielkopolskie

Other projects carried out by the institution »

Principal investigator (from the host institution)

dr hab. Grzegorz Waligóra

Number of co-investigators in the project: 1

Call

OPUS 6 – announced on 2013-09-16

Amount awarded
150 800 PLN
Project start date
2014-07-22
Project end date
2017-07-21
Project duration
36 months (the same as in the proposal)
Project status
Project settled

Information in the final report

Publication in academic press/journals (3)

  1. Comparative analysis of some metaheuristics for discrete-continuous project scheduling with activities of identical processing rates

    Authors:
    Waligóra G.
    Academic press:
    Asia-Pacific Journal of Operational Research (year: 2016, volume: 33 (3), pages: 1650015-1 - 1650015-32), Publisher: World Scientific
    Status:
    Published
    DOI:
    10.1142/S0217595916500159 – link to the publication
  2. Discrete-continuous project scheduling with preemptable activities

    Authors:
    Różycki R., Waligóra G., Węglarz J.
    Academic press:
    Bulletin of the Polish Academy of Sciences: Technical Sciences (year: 2016, volume: 64 (2), pages: 383-393), Publisher: Polish Academy of Sciences
    Status:
    Published
    DOI:
    10.1515/bpasts-2016-0043 – link to the publication
  3. An approach to reduce energy consumption and performance losses on heterogeneous servers using power capping

    Authors:
    Ciesielczyk T., Cabrera A., Oleksiak A., Piątek W., Waligóra G., Almeida F., Blanco V.
    Status:
    Accepted for publication

Articles in post-conference publications (4)

  1. Algorithm for a preemptive project scheduling problem under a continuous resource varying over time

    Authors:
    Waligóra G., Węglarz J.
    Conference:
    15th International Conference on Project Management and Scheduling PMS 2016 (year: 2016, pages: 215-218), Publisher: University of Valencia
    Date:
    conference 19-22.04
    Status:
    Published
  2. Heuristic solving some discrete-continuous project scheduling problems with discounted cash flows

    Authors:
    Waligóra G., Różycki R.
    Conference:
    21st IEEE International Conference on Methods and Models in Automation and Robotics MMAR 2016 (year: 2016, pages: 971-974), Publisher: IEEE
    Date:
    conference 29.08-01.09
    Status:
    Published
  3. Genetic algorithm for a discrete-continuous project scheduling problem with discounted cash flows

    Authors:
    Waligóra G.
    Conference:
    20th IEEE International Conference on Methods and Models in Automation and Robotics MMAR 2015 (year: 2015, pages: 52-57), Publisher: IEEE
    Date:
    conference 24-27.08
    Status:
    Published
  4. Metaheuristics for some discrete-continuous project scheduling problems to maximize the net present value

    Authors:
    Waligóra G.
    Conference:
    22nd IEEE International Conference on Methods and Models in Automation and Robotics MMAR 2017 (year: 2017, pages: 471-476), Publisher: IEEE
    Date:
    conference 28-31.08
    Status:
    Published

Book publications / chapters in book publications (1)

  1. Continuous resources

    Authors:
    Waligóra G., Węglarz J.
    Book:
    Handbook on Project Management and Scheduling (year: 2015, volume: 1, pages: 191-202), Publisher: Springer
    Status:
    Published

« New search

Graphic design and implementation: Jakub Piotrowski