Models and algorithms for some discrete-continuous project scheduling problems
2013/11/B/ST6/00970
Keywords
Descriptors
- ST6_12: Obliczenia naukowe, narzędzia modelowania i symulacji
- ST6_6: Algorytmika, algorytmy równoległe, rozproszone i sieciowe, algorytmiczna teoria gier
- ST6_14: Inne zagadnienia pokrewne
Panel
ST6 – Computer science and informatics: informatics and information systems, computer science, scientific computing, intelligent systems
Host institution
Politechnika Poznańska, Wydział Informatyki
Voivodeship: wielkopolskie
Principal investigator (from the host institution)
Number of co-investigators in the project: 1
Call
OPUS 6 – announced on 2013-09-16
- Amount awarded
- 150 800 PLN
- Project start date
- 2014-07-22
- Project end date
- 2017-07-21
- Project duration
- 36 months (the same as in the proposal)
- Project status
- Project settled
Information in the final report
Publication in academic press/journals (3)
-
Comparative analysis of some metaheuristics for discrete-continuous project scheduling with activities of identical processing rates
- Authors:
- Waligóra G.
- Academic press:
- Asia-Pacific Journal of Operational Research (year: 2016, volume: 33 (3), pages: 1650015-1 - 1650015-32), Publisher: World Scientific
- Status:
- Published
- DOI:
- 10.1142/S0217595916500159 – link to the publication
-
Discrete-continuous project scheduling with preemptable activities
- Authors:
- Różycki R., Waligóra G., Węglarz J.
- Academic press:
- Bulletin of the Polish Academy of Sciences: Technical Sciences (year: 2016, volume: 64 (2), pages: 383-393), Publisher: Polish Academy of Sciences
- Status:
- Published
- DOI:
- 10.1515/bpasts-2016-0043 – link to the publication
-
An approach to reduce energy consumption and performance losses on heterogeneous servers using power capping
- Authors:
- Ciesielczyk T., Cabrera A., Oleksiak A., Piątek W., Waligóra G., Almeida F., Blanco V.
- Status:
- Accepted for publication
Articles in post-conference publications (4)
-
Algorithm for a preemptive project scheduling problem under a continuous resource varying over time
- Authors:
- Waligóra G., Węglarz J.
- Conference:
- 15th International Conference on Project Management and Scheduling PMS 2016 (year: 2016, pages: 215-218), Publisher: University of Valencia
- Date:
- conference 19-22.04
- Status:
- Published
-
Heuristic solving some discrete-continuous project scheduling problems with discounted cash flows
- Authors:
- Waligóra G., Różycki R.
- Conference:
- 21st IEEE International Conference on Methods and Models in Automation and Robotics MMAR 2016 (year: 2016, pages: 971-974), Publisher: IEEE
- Date:
- conference 29.08-01.09
- Status:
- Published
-
Genetic algorithm for a discrete-continuous project scheduling problem with discounted cash flows
- Authors:
- Waligóra G.
- Conference:
- 20th IEEE International Conference on Methods and Models in Automation and Robotics MMAR 2015 (year: 2015, pages: 52-57), Publisher: IEEE
- Date:
- conference 24-27.08
- Status:
- Published
-
Metaheuristics for some discrete-continuous project scheduling problems to maximize the net present value
- Authors:
- Waligóra G.
- Conference:
- 22nd IEEE International Conference on Methods and Models in Automation and Robotics MMAR 2017 (year: 2017, pages: 471-476), Publisher: IEEE
- Date:
- conference 28-31.08
- Status:
- Published
Book publications / chapters in book publications (1)
-
Continuous resources
- Authors:
- Waligóra G., Węglarz J.
- Book:
- Handbook on Project Management and Scheduling (year: 2015, volume: 1, pages: 191-202), Publisher: Springer
- Status:
- Published