Projects funded by the NCN


Information on the principal investigator and host institution

Information of the project and the call

Keywords

Equipment

Delete all

Effective jobs scheduling in cyclic production systems

2012/05/B/ST7/00102

Keywords:

scheduling discrete optimization metaheuristics

Descriptors:

  • ST7_4: Micro- and nanosystems engineering
  • ST7_1: Control engineering in automation and robotics
  • ST6_6: Algorithms, parallel, distributed and network algorithms, algorithmic game theory

Panel:

ST7 - Systems and communication engineering: electronics, communication, optoelectronics

Host institution :

Politechnika Wrocławska, Wydział Elektroniki

woj. dolnośląskie

Other projects carried out by the institution 

Principal investigator (from the host institution):

dr hab. Wojciech Bożejko 

Number of co-investigators in the project: 5

Call: OPUS 3 - announced on 2012-03-15

Amount awarded: 406 400 PLN

Project start date (Y-m-d): 2013-02-08

Project end date (Y-m-d): 2015-05-07

Project duration:: 27 months (the same as in the proposal)

Project status: Project settled

Equipment purchased [PL]

  1. Serwer obliczeniowy GPU z interfejsem sterującym testową linią produkcyjną (39 800 PLN)

Information in the final report

  • Publication in academic press/journals (4)
  • Articles in post-conference publications (7)
  • Book publications / chapters in book publications (7)
  1. Block approach to the cyclic flow shop scheduling
    Authors:
    Bożejko W., Uchroński M., Wodecki M.
    Academic press:
    Computers & Industrial Engineering (rok: 2015, tom: 81, strony: 158-166), Wydawca: Elsevier
    Status:
    Published
    DOI:
    10.1016/j.cie.2015.01.004 - link to the publication
  2. Generalized Gaussian processes and relations with random matrices and positive definite functions on permutation groups
    Authors:
    Marek Bożejko, Wojciech Bożejko
    Academic press:
    Infinite Dimensional Analysis, Quantum Probability and Related Topics Vol. 18, No. 3 (2015), 1550020-1 - 1550020-19 (rok: 2015, tom: 18, strony: 45310), Wydawca: World Scientific
    Status:
    Published
    DOI:
    10.1142/S0219025715500204 - link to the publication
  3. Parallel Tabu Search Algorithm for the Hybrid Flow Shop Problem
    Authors:
    Bożejko W., Pempera J., Smutnicki C.
    Academic press:
    Computers & Industrial Engineering (rok: 2013, tom: 65, strony: 466-474), Wydawca: Elsevier
    Status:
    Published
    DOI:
    10.1016/j.cie.2013.04.007 - link to the publication
  4. Solving resource-constrained construction scheduling problems with overlaps by metaheuristic
    Authors:
    Bożejko W., Hejducki Z., Uchroński M., Wodecki M.
    Academic press:
    Journal of Civil Engineering and Management (rok: 2014, tom: 20(5), strony: 649–659), Wydawca: Taylor & Francis
    Status:
    Published
    DOI:
    10.3846/13923730.2014.906496 - link to the publication
  1. Scheduling problem with uncertain parameters in Just in Time system
    Authors:
    Bożejko W., Rajba P., Wodecki M.
    Conference:
    International Conference on Artificial Intelligence and Soft Computing Web System, ICAISC 2014 (rok: 2014, ), Wydawca: Lecture Notes in Artificial Intelligence No. 8468, Springer
    Data:
    konferencja 1-5 czerwiec 2014
    Status:
    Published
  2. Cyclic hybrid flow-shop scheduling with machine setups
    Authors:
    Bożejko W., Gniewkowski Ł., Pempera J., Wodecki M.
    Conference:
    International Conference on Computational Science, ICCS 2014 (rok: 2014, ), Wydawca: Procedia Computer Science Volume 29, Elsevier
    Data:
    konferencja 10-12 czerwiec 2014
    Status:
    Published
  3. On underwater vehicle routing problem
    Authors:
    Bożejko W., Jagiełło S., Lower M., Smutnicki C.
    Conference:
    Computer Aided Systems Theory (rok: 2015, ), Wydawca: Universidad de Las Palmas De Gran Canaria
    Data:
    konferencja 42036
    Status:
    Published
  4. Parallel Coevolutionary Algorithm for Three-Dimensional Bin Packing Problem
    Authors:
    Bożejko W., Kacprzak Ł., Wodecki M.
    Conference:
    The 14th International Conference on Artificial Intelligence and Soft Computing ICAISC 2015 (rok: 2015, ), Wydawca: Lecture Notes in Artificial Intelligence No. 9119, Springer (2015), 319-328.
    Data:
    konferencja 14-18.06.2015
    Status:
    Published
  5. Parallel Cost Function Determination on GPU for the Vehicle Routing Problem
    Authors:
    Wodecki M., Bożejko W., Jagiełło S., Pempera J.
    Conference:
    The 14th International Conference on Artificial Intelligence and Soft Computing ICAISC 2015 (rok: 2015, ), Wydawca: Lecture Notes in Artificial Intelligence No. 9120, Springer (2015), 778-788.
    Data:
    konferencja 14-18.06.2015
    Status:
    Published
  6. Parallel Simulated Annealing Algorithm for Cyclic Flexible Job Shop Scheduling Problem
    Authors:
    Bożejko W., Pempera J., Wodecki M.
    Conference:
    The 14th International Conference on Artificial Intelligence and Soft Computing ICAISC 2015 (rok: 2015, ), Wydawca: Lecture Notes in Artificial Intelligence No. 9120, Springer (2015), 603-612.
    Data:
    konferencja 14-18.06.2015
    Status:
    Published
  7. Solving timetabling problems on GPU
    Authors:
    Bożejko W., Gniewkowski Ł., Wodecki M.
    Conference:
    International Conference on Artificial Intelligence and Soft Computing Web System, ICAISC 2014 (rok: 2014, ), Wydawca: Lecture Notes in Artificial Intelligence No. 8468, Springer
    Data:
    konferencja 1-5 czerwiec 2014
    Status:
    Published
  1. Harmonogramowanie cykliczne w przepływowych systemach produkcyjnych
    Authors:
    Jarosław Pempera
    Book:
    Innowacje w Zarządzaniu i Inżynierii Produkcji (red. R. Knosala) (rok: 2014, tom: 1, strony: 624-634), Wydawca: Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją
    Status:
    Published
  2. Cykliczny problem przepływowy z przezbrojeniami maszyn
    Authors:
    Bożejko W., Kacprzak Ł., Wodecki M.
    Book:
    Innowacje w Zarządzaniu i Inżynierii Produkcji (red. R. Knosala) (rok: 2014, tom: 1, strony: 484-493), Wydawca: Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją
    Status:
    Published
  3. Równoległy algorytm przeszukiwania z zabronieniami dla cyklicznego problemu gniazdowego
    Authors:
    Bożejko W., Gnatowski A., Wodecki M.
    Book:
    Innowacje w Zarządzaniu i Inżynierii Produkcji (red. R. Knosala) (rok: 2015, tom: Tom II, strony: 622-632), Wydawca: Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją
    Status:
    Published
  4. monografia książkowa
    Authors:
    Bożejko W., Pempera J., Smutnicki C., Wodecki M.
    Book:
    Zaawansowane modele i algorytmy optymalizacji w systemach cyklicznych (rok: 2017, ), Wydawca: Wydawnictwo EXIT
    Status:
    Submitted
  5. Analiza harmonogramów powykonawczych w budownictwie
    Authors:
    Bożejko W., Hejducki Z., Uchroński M., Wodecki M.
    Book:
    Innowacje w Zarządzaniu i Inżynierii Produkcji (red. R. Knosala) (rok: 2014, tom: 1, strony: 474-483), Wydawca: Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją
    Status:
    Published
  6. Harmonogramowanie cykliczne w jednostkach opieki zdrowotnej
    Authors:
    Jarosław Pempera
    Book:
    Innowacje w Zarządzaniu i Inżynierii Produkcji (rok: 2015, tom: Tom I, strony: 277-287), Wydawca: Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją
    Status:
    Published
  7. Stochastyczny problem przepływowy z terminami zokończenia operacji
    Authors:
    Bożejko W., Rajba P., Wodecki M.
    Book:
    Innowacje w Zarządzaniu i Inżynierii Produkcji (red. R. Knosala) (rok: 2015, tom: Tom II, strony: 633-644), Wydawca: Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją
    Status:
    Published