A new high-energy hybrid system for energy storage in hydrogen absorbing alloys with ionic liquid-based electrolyte

2025/57/B/ST11/01263

Keywords

Descriptors

  • ST11_02: Inżynieria metali i stopów
  • ST11_05: Inżynieria materiałów kompozytowych, hybrydowych i funkcjonalnych materiałów gradientowych
  • ST11_06: Inżynieria materiałów węglowych

Panel

ST11 – Materials Engineering

Host institution

Uniwersytet Warszawski

Voivodeship: mazowieckie

Other projects carried out by the institution »

Principal investigator (from the host institution)

prof. Andrzej Aleksander Czerwiński

Number of co-investigators in the project: 9

Call

OPUS 29 – announced on 2025-03-17

Amount awarded
2 418 479 PLN
Project start date
2026-01-22
Project end date
2030-01-21
Project duration
48 months (the same as in the proposal)
Project status
Pending project

Project description

Download the project description in a pdf file

Note — project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.

« New search

Graphic design and implementation: Jakub Piotrowski