Fire dynamics of high-power electrical network and multi-scale smart risk evaluation model for new-energy buildings

2025/56/Q/ST8/00425

Keywords

Descriptors

  • ST8_02: Inżynieria wodna, inżynieria lądowa, inżynieria lotnicza
  • ST8_05: Systemy energetyczne: produkcja, dystrybucja

Panel

ST8 – Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems

Host institution

Instytut Techniki Budowlanej

Voivodeship: mazowieckie

Other projects carried out by the institution »

Principal investigator (from the host institution)

dr hab. Wojciech Węgrzyński

Number of co-investigators in the project: 5

Call

SHENG 4 – announced on 2024-12-16

Amount awarded
1 025 007 PLN
Project start date
2026-03-02
Project end date
2029-03-01
Project duration
36 months (the same as in the proposal)
Project status
Pending project

Project description

Download the project description in a pdf file

Note — project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.

« New search

Graphic design and implementation: Jakub Piotrowski