2024/53/N/ST8/04144
Keywords:
fuel cell stack reactant distribution system manifold interconnector fuel cell formic acid mass transport intensification computational fluid dynamics electrochemistry sustainable energy 3D printing
Descriptors:
Panel:
ST8 - Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Principal investigator (from the host institution):
Number of co-investigators in the project: 2
Call: PRELUDIUM 23 - announced on 2024-03-21
Amount awarded: 209 937 PLN
Project start date (Y-m-d): 2025-01-20
Project end date (Y-m-d): 2028-01-19
Project duration:: 36 months (the same as in the proposal)
Project status: Pending project
Download the project description in a pdf file
Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.