Incorporation of local TiN thin films heterogeneities into the full-field hybrid fracture model based on the digital material representation (DMR) concept
2024/53/B/ST8/00808
Keywords
Descriptors
- ST8_03: Inżynieria obliczeniowa, komputerowe wspomaganie modelowania, projektowania i produkcji
- ST11_14: Metody obliczeniowe dla inżynierii materiałowej
Panel
ST8 – Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution
Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie
Voivodeship: małopolskie
Principal investigator (from the host institution)
Number of co-investigators in the project: 7
Call
OPUS 27 – announced on 2024-03-21
- Amount awarded
- 894 870 PLN
- Project start date
- 2025-01-29
- Project end date
- 2029-01-28
- Project duration
- 48 months (the same as in the proposal)
- Project status
- Pending project
Project description
Download the project description in a pdf file
Note — project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.