Experimental evaluation of influence of oil refinery waste materials used as a partial substitute of cement and natural aggregate on the properties of cementitious composite (MOR-CEM)
2023/51/D/ST8/00601
Keywords
Descriptors
- ST8_02: Inżynieria wodna, inżynieria lądowa, inżynieria lotnicza
Panel
ST8 – Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution
Politechnika Wrocławska
Voivodeship: dolnośląskie
Principal investigator (from the host institution)
Number of co-investigators in the project: 3
Call
SONATA 19 – announced on 2023-09-18
- Amount awarded
- 502 619 PLN
- Project start date
- 2024-10-01
- Project end date
- 2027-09-30
- Project duration
- 36 months (the same as in the proposal)
- Project status
- Pending project
Project description
Download the project description in a pdf file
Note — project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.
Information in the final report
Publication in academic press/journals (1)
-
A way to reuse petrochemical wastes through the partial substitution of cement by spent cracking catalyst and its effect on cement pastes
- Authors:
- Paweł Niewiadomski, Michał W. Cisiński, Barbara Batog, Agnieszka E. Chowaniec-Michalak, Elżbieta Janowska-Renkas, Martyna Nieświec
- Academic press:
- Scientific Reports (year: 2025, volume: 16/3305, pages: 46043), Publisher: Nature
- Status:
- Published
- DOI:
- 10.1038/s41598-025-33310-1 – link to the publication