Research on the raw sewage sludge transformation to hydrochar and lipids due to combined hydrothermal and biological treatment
2023/49/N/ST8/01913
Keywords
Descriptors
- ST8_01: Inżynieria chemiczna, chemia techniczna, inżynieria środowiska, inżynieria sanitarna, inżynieria procesowa
- NZ9_09: Biotechnologia środowiskowa
Panel
ST8 – Production and processes engineering: modelling, product design, process design and control, construction methods and engineering, power units and systems
Host institution
Uniwersytet Przyrodniczy we Wrocławiu
Voivodeship: dolnośląskie
Principal investigator (from the host institution)
Number of co-investigators in the project: 3
Call
PRELUDIUM 22 – announced on 2023-03-16
- Amount awarded
- 69 975 PLN
- Project start date
- 2024-01-03
- Project end date
- 2025-07-02
- Project duration
- 18 months (the same as in the proposal)
- Project status
- Project completed
Project description
Download the project description in a pdf file
Note — project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.
Information in the final report
Publications will be made available after the final report has been accepted.