Projects funded by the NCN


Information on the principal investigator and host institution

Information of the project and the call

Keywords

Equipment

Delete all

Advanced optimization methods of automated cyclic processes

2017/25/B/ST7/02181

Keywords:

optimization systems engineering scheduling

Descriptors:

  • ST7_4: Micro- and nanosystems engineering
  • ST6_6: Algorithms, parallel, distributed and network algorithms, algorithmic game theory
  • ST7_12: Electrical energy production, distribution and application

Panel:

ST7 - Systems and communication engineering: electronics, communication, optoelectronics

Host institution :

Politechnika Wrocławska

woj. dolnośląskie

Other projects carried out by the institution 

Principal investigator (from the host institution):

dr hab. Wojciech Bożejko 

Number of co-investigators in the project: 4

Call: OPUS 13 - announced on 2017-03-15

Amount awarded: 403 460 PLN

Project start date (Y-m-d): 2018-01-19

Project end date (Y-m-d): 2021-05-18

Project duration:: 40 months (the same as in the proposal)

Project status: Project settled

Project description

Download the project description in a pdf file

Note - project descriptions were prepared by the authors of the applications themselves and placed in the system in an unchanged form.

Equipment purchased [PL]

  1. Stacja robocza z koprocesorową kartą obliczeniową (27 000 PLN)

Information in the final report

  • Publication in academic press/journals (9)
  • Articles in post-conference publications (16)
  • Book publications / chapters in book publications (5)
  1. Algorithm for solving the Discrete-Continuous Inspection Problem
    Authors:
    Grymin R., Bożejko W., Z. Chaczko, Pempera J., Wodecki M.
    Academic press:
    Archives of Control Sciences (rok: 2020, tom: 30(LXVI), No. 4, strony: 653–666), Wydawca: Polish Academy of Sciences, Committee of Automatic Control and Robotics
    Status:
    Published
    DOI:
    10.24425/acs.2020.135845 - link to the publication
  2. Flowshop scheduling of construction processes with uncertain parameters
    Authors:
    Bożejko W., Hejducki Z., Wodecki M.
    Academic press:
    Archives of Civil and Mechanical Engineering (rok: 2019, tom: Vol. 19 Issue 1, strony: 194-204), Wydawca: Elsevier
    Status:
    Published
    DOI:
    10.1016/j.acme.2018.09.010 - link to the publication
  3. On the simulated annealing adaptation for tasks transportation optimization
    Authors:
    Anna Burduk, Wojciech Bożejko, Jarosław Pempera, Kamil Musiał
    Academic press:
    Logic Journal of the IGPL (rok: 2018, tom: 26, Issue 6, strony: 518-592), Wydawca: Oxford Academic Publ.
    Status:
    Published
    DOI:
    10.1093/jigpal/jzy022 - link to the publication
  4. Designing cyclic schedules for streaming repetitive job-shop manufacturing systems with blocking and no-wait constraints
    Authors:
    Robert Wójcik, Jarosław Pempera
    Academic press:
    IFAC-PapersOnLine (rok: 2019, tom: 52, nr 10, strony: 73-78), Wydawca: Elsevier
    Status:
    Published
  5. Neuro-tabu search approach to scheduling in automotive manufacturing
    Authors:
    Bożejko W., Burduk A., Musiał K., Pempera J.
    Academic press:
    Neurocomputing (rok: 2021, tom: Volume 452, strony: 435-442), Wydawca: Elsevier
    Status:
    Published
    DOI:
    10.1016/j.neucom.2020.01.121 - link to the publication
  6. Optimization of production process for resource utilization
    Authors:
    Bożejko W., Burduk A., Pempera J., Wodecki M.
    Academic press:
    Archives of Civil and Mechanical Engineering (rok: 2019, tom: Vol. 19 Issue 4, strony: 1251-1258), Wydawca: Elsevier
    Status:
    Published
    DOI:
    10.1016/j.acme.2019.07.002 - link to the publication
  7. Cyclic flow-shop scheduling with no-wait constraints and missing operations
    Authors:
    C. Smutnicki, J. Pempera, G. Bocewicz, Z Banaszak
    Academic press:
    European Journal of Operational Research (rok: 2021, ), Wydawca: Elsevier
    Status:
    Submitted
  8. Blocks for two-machines total weighted tardiness flow shop scheduling problem
    Authors:
    Bożejko W., Uchroński M., Wodecki M.
    Academic press:
    Bulletin of the Polish Academy of Sciences - Technical Sciences (rok: 2020, tom: 68, No. 1, strony: 31-41), Wydawca: Polish Academy of Sciences
    Status:
    Published
    DOI:
    10.24425/bpasts.2020.131829 - link to the publication
  9. Milk-run routing and scheduling subject to a trade-off between vehicle fleet size and storage capacity
    Authors:
    Bocewicz G., Bożejko W., Wójcik R., Banaszak Z.
    Academic press:
    Management and Production Engineering Review Volume 10, Number 3 (rok: 2019, tom: 10, strony: 41–53), Wydawca: Polska Akademia Nauk
    Status:
    Published
    DOI:
    10.24425/mper.2019.129597 - link to the publication
  1. BLOKI DLA DWUMASZYNOWEGO SUMOKOSZTOWEGO PROBLEMU PRZEPŁYWOWEGO
    Authors:
    Wojciech BOŻEJKO, Mariusz UCHROŃSKI, Mieczysław WODECKI
    Conference:
    Krajowa Konferencja Automatyzacji Procesów Dyskretnych KKAPD 2018 (rok: 2018, ), Wydawca: Politechnika Śląska
    Data:
    konferencja 26-29 września 2018
    Status:
    Published
  2. Cyclic Scheduling of Lots with Setup Times
    Authors:
    Smutnicki C.
    Conference:
    International Conference on Methods and Models in Automation and Robotics (rok: 2019, ), Wydawca: IEEE Press
    Data:
    konferencja 23-26 August 2019.
    Status:
    Published
  3. Meta-heuristic task scheduling algorithm for computing cluster with 2D packing problem approach
    Authors:
    Wojciech Bożejko, Zenon Chaczko, Piotr Nadybski, and Mieczysław Wodecki
    Conference:
    Thirteenth International Conference on Dependability and Complex Systems DepCos-RELCOMEX 2018 (rok: 2018, ), Wydawca: Springer
    Data:
    konferencja 2-6.07.2018
    Status:
    Published
  4. Minimization of the Number of Employees in Manufacturing Cells
    Authors:
    Bożejko W., Pempera J., Wodecki M.
    Conference:
    SOCO'18-CISIS'18-ICEUTE'18 2018 (rok: 2019, ), Wydawca: Springer
    Data:
    konferencja 43257
    Status:
    Published
  5. On Cyclic Job Shop Scheduling Problem
    Authors:
    Wojciech Bożejko, Mieczysław Wodecki
    Conference:
    2018 IEEE 22nd International Conference on Intelligent Engineering Systems (INES) (rok: 2018, ), Wydawca: IEEE Press
    Data:
    konferencja 21-23.062018
    Status:
    Published
  6. A new approach for cyclic manufacturing
    Authors:
    Czesław Smutnicki
    Conference:
    INES 2018, 22nd IEEE International Conference on Intelligent Engineering Systems (rok: 2018, ), Wydawca: IEEE
    Data:
    konferencja 21-23 czerwiec 2018
    Status:
    Published
  7. Robustness of the uncertain single machine total weighted tardiness problem with elimination criteria applied
    Authors:
    Wojciech Bożejko, Paweł Rajba, and Mieczysław Wodecki
    Conference:
    Thirteenth International Conference on Dependability and Complex Systems DepCos-RELCOMEX 2018 (rok: 2018, ), Wydawca: Springer
    Data:
    konferencja 2-6.07.2018
    Status:
    Published
  8. Efficient Tabu Search Algorithm for the Cyclic Inspection Problem
    Authors:
    Wojciech Bożejko, Radoslaw Grymin, Jaroslaw Pempera and Mieczyslaw Wodecki
    Conference:
    16th International Conference on Soft Computing Models in Industrial and Environmental Applications SOCO2021 (rok: 2021, ), Wydawca: Springer
    Data:
    konferencja 22-24.09.2021
    Status:
    Accepted for publication
  9. Blocks of Jobs for Solving Two-Machine Flow Shop Problem with Normal Distributed Processing Times
    Authors:
    Bożejko W., Rajba P., Wodecki M.
    Conference:
    5th International Conference on Soft Computing Models in Industrial and Environmental Applications (SOCO 2020) (rok: 2021, ), Wydawca: Springer
    Data:
    konferencja 16-18 September 2020
    Status:
    Published
  10. Robust Single Machine Scheduling with Random Blocks in an Uncertain Environment
    Authors:
    Bożejko W., Rajba P., Wodecki M.
    Conference:
    ICCS International Conference on Computational Science (rok: 2020, ), Wydawca: Springer
    Data:
    konferencja 3-5 June 2020
    Status:
    Published
  11. Parallel Block-Based Simulated Annealing for the Single Machine Total Weighted Tardiness Scheduling Problem
    Authors:
    Wojciech Bozejko, Jarosław Pempera, Mariusz Uchronski and Mieczyslaw Wodecki
    Conference:
    16th International Conference on Soft Computing Models in Industrial and Environmental Applications SOCO 2021 (rok: 2021, ), Wydawca: Springer
    Data:
    konferencja 22-24.09.2021
    Status:
    Accepted for publication
  12. A Job Shop Scheduling Problem with Due Dates Under Conditions of Uncertainty
    Authors:
    Bożejko W., Rajba P., Uchroński M., Wodecki M.
    Conference:
    International Conference on Computational Science ICCS 2021 (rok: 2021, ), Wydawca: Springer
    Data:
    konferencja 16-18 June, 2021
    Status:
    Published
  13. The Problem of Tasks Scheduling with Due Dates in a Flexible Multi-machine Production Cell
    Authors:
    Bożejko W., Nadybski P., Rajba P., Wodecki M.
    Conference:
    International Conference on Computational Science ICCS 2021 (rok: 2021, ), Wydawca: Springer
    Data:
    konferencja 16-18 June, 2021
    Status:
    Published
  14. Job shop scheduling with transport by Automated Guided Vehicles
    Authors:
    Czeslaw Smutnicki, Jaroslaw Pempera
    Conference:
    The 16th International Conference on Soft Computing Models in Industrial and Environmental Applications (SOCO'21) (rok: 2021, ), Wydawca: Springer
    Data:
    konferencja 22-24.09.2021
    Status:
    Accepted for publication
  15. Cyclic Scheduling in Interlaced and Non-Interlaced Mode
    Authors:
    Czesław Smutnicki
    Conference:
    23rd International Conference on Methods & Models in Automation & Robotics (MMAR) (rok: 2018, ), Wydawca: IEEE
    Data:
    konferencja 27-30 sierpień 2018
    Status:
    Published
  16. User estimates inaccuracy study in HPC scheduler
    Authors:
    Mariusz Uchroński, Wojciech Bożejko, Zdzisław Krajewski, Mateusz Tykierko, Mieczysław Wodecki
    Conference:
    Dependability of Computer Systems DEPCOS 2018 (rok: 2018, ), Wydawca: Springer
    Data:
    konferencja 2-6.07.2018
    Status:
    Published
  1. nie dotyczy (cała książka)
    Authors:
    Wojciech Bożejko
    Book:
    Parallel algorithms of discrete optimization in manufacturing (rok: 2018, tom: nie dotyczy, strony: 1-192), Wydawca: Akademicka Oficyna Wydawnicza EXIT
    Status:
    Published
  2. Using Graphs for Modeling and Solving Cyclic Flow Shop with Waiting Time Constraints
    Authors:
    C. Smutnicki, W. Bożejko
    Book:
    Graph-based Modelling in Science, Technology and Art (rok: 2021, ), Wydawca: Springer
    Status:
    Accepted for publication
  3. A Numerical Approach to Solving the Aerial Inspection Problem
    Authors:
    Grymin R., Bożejko W., Pempera J.
    Book:
    Smart Innovations in Engineering and Technology (R. Klempous, J. Nikodem, Eds.), Topics in Intlligent Engineering and Informatics 15 (rok: 2020, tom: 15, strony: 243-252), Wydawca: Springer
    Status:
    Published
  4. nie dotyczy (cała książka)
    Authors:
    Bożejko W., Bocewicz G. (red.)
    Book:
    Modelling and Performance Analysis of Cyclic Systems (rok: 2020, tom: nie dotyczy, strony: 1-190), Wydawca: Springer Nature
    Status:
    Published
  5. nie dotyczy (cała książka)
    Authors:
    Wodecki M.
    Book:
    Własności i algorytmy rozwiązywania problemów optymalizacji dyskretnej (rok: 2019, tom: nie dotyczy, strony: 1--183), Wydawca: Akademicka Oficyna Wydawnicza EXIT
    Status:
    Published