Flexible algorithms for facility layout problems in production management and logistics

2011/03/B/HS4/04532

Keywords

Descriptors

  • HS4_8: Zarządzanie organizacjami, zarządzanie strategiczne

Panel

HS4 – Individuals, institutions, markets: economics, finance, management, demography, social and economic geography, urban studies

Host institution

Politechnika Wrocławska, Wydział Informatyki i Zarządzania

Voivodeship: dolnośląskie

Other projects carried out by the institution »

Principal investigator (from the host institution)

dr hab. Jerzy Grobelny

Number of co-investigators in the project: 3

Call

OPUS 2 – announced on 2011-09-15

Amount awarded
179 400 PLN
Project start date
2012-08-23
Project end date
2016-08-22
Project duration
48 months (the same as in the proposal)
Project status
Project settled

Information in the final report

Publication in academic press/journals (2)

  1. Elastyczny algorytm zamiany parami w problemach optymalizacji systemów logistycznych

    Authors:
    Grobelny J., Michalski R.
    Academic press:
    Logistyka (year: 2016, volume: 1, pages: 226-232), Publisher: Instytut Logistyki i Magazynowania (ILiM)
    Status:
    Published
  2. Fuzzy-based linguistic patterns as a tool for the flexible assessment of a priority vector obtained by pairwise comparisons

    Authors:
    Grobelny J.
    Academic press:
    Fuzzy Sets and Systems (year: 2016, volume: 296, pages: 46042), Publisher: Elsevier
    Status:
    Published
    DOI:
    10.1016/j.fss.2015.05.012 – link to the publication

Articles in post-conference publications (4)

  1. A concept of a flexible approach to the facilities layout problems in logistics systems

    Authors:
    Grobelny J., Michalski R.
    Conference:
    ISAT 2015 (year: 2016, pages: 171-181), Publisher: Springer
    Date:
    conference September 20-22, 2015
    Status:
    Published
    DOI:
    link to the publication
  2. The use of scatter plots for finding initial solutions for the CRAFT facility layout problem algorithm

    Authors:
    Grobelny J., Michalski R., Koszela J., Wiercioch M.
    Conference:
    Annual International Conference on Industrial, Systems and Design Engineering (year: 2013, pages: IND2013-0625), Publisher: ATINER'S Conference Paper Series
    Date:
    conference 24-27 czerwca
    Status:
    Published
    DOI:
    link to the publication
  3. Experimental examination of facilities layout problems in logistics systems including objects with diverse sizes and shapes.

    Authors:
    Grobelny J., Michalski R.
    Conference:
    ISAT 2015 (year: 2016, pages: 159-169), Publisher: Springer
    Date:
    conference September 20-22, 2015
    Status:
    Published
    DOI:
    link to the publication
  4. The role of initial solutions in craft and simulated annealing applied to real life logistics problems

    Authors:
    Michalski R., Grobelny J.
    Conference:
    International Symposium on Marketing and Logistics (ISML 2014) (year: 2014, pages: 94-102), Publisher: International Business Academics Consortium
    Date:
    conference September 8 - 10
    Status:
    Published

Book publications / chapters in book publications (1)

  1. Problem rozmieszczania obiektów w zarządzaniu operacyjnym

    Authors:
    Koszela J.
    Book:
    Zarządzanie operacyjne w teorii i praktykce. Systemy, procesy, narzędzia. (year: 2013, volume: -, pages: 99-111), Publisher: Politechnika Gdańska
    Status:
    Published

« New search

Graphic design and implementation: Jakub Piotrowski